Back to FAQ Page

Instructions to assist in the installation of the blue/green standard Euro safety frame pad

Before installing the pad you should see the following trampoline components moving from the outside in:
Exterior top rail - has holes in it and one end of the spring goes into the holes;
Springs;
"V" rings sewn on to the bed or jumping surface - the other end of the spring attaches to the "V" ring;
The black jumping surface.

These straps are tied to the nearest "V" ring on the jumping surface (mat or bed).
This secures the inner diameter of the pad.


This goes around the top rail and clips on a "V" ring.
This secures the outer diameter of the pad.

Back to FAQ Page